Total (A+B + C + D + E + F + G + H) Waste intensity per rupee of turnover (Total waste generated / Revenue from operations in millions)
Waste intensity per rupee of turnover adjusted for Purchasing Power Parity (PPP) (Total waste generated / Revenue from operations adjusted for PPP in millions)
Waste intensity in terms of physical output Waste intensity (optional) – the relevant metric may be selected by the entity
For each category of waste generated, total waste recovered through recycling, re-using or other recovery operations (in metric tonnes)
Category of waste (i) Recycled (ii) Re-used (iii) Other recovery operations
Total
11,573.436 For each category of waste generated, total waste disposed by nature of disposal method (in metric tonnes) Category of waste (i) Incineration (ii) Landfilling (iii) Other disposal operations
Co-processing Preprocessing Composting
Utilization of C&D waste
Sent to common bio medical waste treatment facility Total
0.39 10491.25 Note: * Revenue from operations adjusted for PPP has been revised based on the industry standard Note: Indicate if any independent assessment/ evaluation/assurance has been carried out by an external agency? (Y/N) If yes, name of the external agency
10. Briefly describe the waste management practices adopted in your establishments. Describe the strategy adopted by your company to reduce usage of hazardous and toxic chemicals in your products and processes and the practices adopted to manage such wastes
Hazardous waste generated at GNFC is systematically collected and stored at designated facilities earmarked for such materials. Its handling and disposal are undertaken in accordance with the Consolidated Consent & Authorization (CC&A) issued by the Gujarat
Pollution Control Board (GPCB) and in compliance with the Hazardous and Other Wastes
(Management and Transboundary Movement) Rules, 2016, as amended.
11. If the entity has operations/offices in/around ecologically sensitive areas (such as national parks, wildlife sanctuaries, biosphere reserves, wetlands, biodiversity hotspots, forests, coastal regulation zones etc.) where environmental approvals / clearances are required, please specify details in the following format:
S. No Location of operations/offices
Whether the conditions of environmental approval / clearance are being complied with? (Y/N) If no, the reasons thereof and corrective action taken, if any
GNFC’s operational facilities at Bharuch and Dahej are situated within designated industrial zones, with the Dahej site located in a notified Petroleum, Chemicals and Petrochemicals Investment Region (PCPIR). None of the Company’s sites or offices are located within or in proximity to environmentally sensitive areas such as national parks, wildlife sanctuaries, biosphere reserves, wetlands, biodiversity hotspots, forest regions, or coastal regulation zones.
50 Annual Report 2025-2026 | 095