Back
Flip
Vertical
Horizontal
All Pages
1 / 30
Mailing List
Share
Fullscreen
ricson liow chun guan avatar

PP_EPORTFOLIO_0351029

By ricson liow chun guan

Go to stand
Share link
https://covver.com/magazine/ric13320/pp-eportfolio-0351029-2
Published
Jul 23, 2026
Pages
30

More in this magazine

  • ARC 62604BACHELOR OF ARTS (HONOURS) IN INTERIOR ARCHITECTURE PROFESSIONAL
  • 01 ASSIGNMENT 1GROUP PRESENTATION SPREAD (SPACE LIGHT & VENTILATION) WEEKLY PROGRESS SUBMISSIONS
  • Page 301 ASSIGNMENT 1
  • SPACE, LIGHT & VENTILATIONBY-LAW 35 ACCESS FROM A STREET
  • BY-LAW 37PROJECTIONS OVER THE STREET AND OVER THE BUILDING LINE BY-LAW 39
  • BY-LAW 40AIR-WELLS Skylight to maximize use of natural light.
  • Page 73 This provision apply to building with mechanically ventilated or air conditioned. The provisions of these bylaws regarding natural ventilation and natural lighting shall not apply to lavatories, water closets, bathrooms, or corridors where permanent mechanical ventilation is provided for and maintained in accordance with the requirements of the Third Schedule to these bylaws.
  • DRAFT SUBMISSIONSPACE,LIGHT & VENTILATION
  • Page 9UBBL SPACE,LIGHT & VENTILATION
  • Page 1002 ASSIGNMENT 2
  • QUESTION 1QUESTION 1 INTERIOR DESIGN LICENSURE EXAMINATION
  • QUESTION 1QUESTION 1B QUESTION 1A
  • QUESTION 2QUESTION 2 (30 marks)
  • QUESTION 2QUESTION 28 QUESTION 2A
  • Page 1503 ASSIGNMENT 3
  • SIZE: 893SQFTRENTAL: RM3600/MONTH RENT RATE: RM 4.14 PSF (FLOOR)
  • SERVICE FRAMEWORKMARKETINGS STRATEGIES SPATIAL PLANNING & DESIGN CONSULTANCY (01
  • FUTURE PRACTICEDIGITAL & SMART DESIGN PRACTICE D
  • DRAFT SUBMISSIONSTAMPING MONTHLY EXPENDITURE
  • Page 2104 FINAL ASSIGNMENT
  • LIOW CHUN GUAN 0351029PROFESSIONAL PPRACTICE ARC 62604 FINAL PROJECT
  • SEVENTH SCHEDULE: MAXIMUM TRAVEL DISTANCEMEASUREMENT OF TRAVI UBBL 140(3G) THE MAXIMUM TRAVEL DISTANCES SHALL BE AS SPECIFIED IN THE SEV EXITS TO BE ACCESSIBLE AT ALL TIMES
  • EL DISTANCE TO EXITSTO EXITS AND DEAD END LIMITS ENTH SCHEDULE OF THESE BY LAWS EXIT ROUTE
  • DISABLED ACCESSIBILITYEXTINGUISHING SYSTEM FIRE ALARM
  • DRAFT SUBMISSIONDESIGN PROJECT ECHOES SACRED ECHOES IS AN IMMERSIVE CULTURAL EXPERIENCE CENTRE INSPIRED BY THE NINE EMPEROR GODS FESTIVAL AND THE PHILOSOPHY OF YIN AND YANG LOCATED IN ROYAL KLANG TOWN, THE PROJECT AIMS TO PRESERVE AND REINTERPRET LOCAL CULTURAL HERITAGE THROUGH INTERACTIVE EXHIBITIONS RITUAL-INSPIRED SPATIAL EXPERIENCES, TRADITIONAL CRAFT WORKSHOPS LEARNING SPACES AND COMMUNITY GATHERING AREAS. THE DESIGN CREATES A CONTEMPORARY PLATFORM FOR CULTURAL EDUCATION ENGAGEMENT AND CONTION WHILE STRENGTHENING APPRECIATION BETWE TRADITION
  • Page 2705 CONCLUSION
  • REFLECTIVE ESSAYTHIS PROFESSIONAL PRACTICE MODULE HAS PROVIDED ME WITH A DEEPER UNDERSTANDING OF THE RESPONSIBILITIES AND REALITIES OF BECOMING A PROFESSIONAL INTERIOR DESIGNER. THROUGHOUT THE SEMESTER, I GAINED VALUABLE KNOWLEDGE BEYOND THE DESIGN PROCESS, INCLUDING BUILDING BY-LAWS, PROFESSIONAL ETHICS, LICENSING REQUIREMENTS, CONSULTANCY PRACTICE, BUSINESS MANAGEMENT, AND STATUTORY SUBMISSION PROCEDURES. EACH ASSIGNMENT CHALLENGED ME TO THINK CRITICALLY, CONDUCT THOROUGH RESEARCH, AND APPLY INDUSTRY STANDARDS IN A PRACTICAL CONTEXT. WORKING ON THESE PROJECTS HAS STRENGTHENED MY ABILITY TO CONNECT CREATIVE DESIGN WITH PROFESSIONAL PRACTICE. I REALISED THAT SUCCESSFUL INTERIOR DESIGN IS NOT ONLY ABOUT CREATING
  • Page 2906 E-PORTFOLIO LINK
Text of this page

EL DISTANCE TO EXITS

TO EXITS AND DEAD END LIMITS ENTH SCHEDULE OF THESE BY LAWS

EXIT ROUTE

LEGENDS

UBBL 169

NO EXIT ROUTE MAY REDUCE IN WIDTH ALONG ITS PATH OF TRAVEL FROM THE STOREY EXIT TO THE FINAL EXIT.

Sprinkler Head

HORIZONTAL EXITS

WITH HORIZONTAL EXITS, STAIRCASES AND FINAL EXITS MUST ACCOMMODATE THE LARGER COMPARTMENT'S LOAD, BUT TOTAL EXIT WIDTH MUST BE AT LEAST HALF OF WHAT THE WHOLE BUILDING REQUIRES.

  • REMOTE
  • POINT
  • FINAL EXIT
  • UBBL 171
  • Fire Alarm Call Point
  • Fire Alarm Bell
  • EXIT DOORS

. EXIT DOORS MUST BE EASILY OPENED FROM INSIDE WITHOUT A KEY.

UBBL

Emergency Exit Sign

DOORS MUST AUTO-CLOSE AND RELEASE DURING POWER FAILURE OR FIRE ALARM.

  • Emergency Light
  • E SUSTAINABLE SPACE DESIGN
  • FLEXIBLE LAYOUT ≥ 25%
  • OPEN LAYOUT ≥ 50%
  • RECREATION
  • Fire Extinguisher
  • HOT DESKING 30% WORKSTATIONS
  • • WIRELESS CONNECTIVITY
  • DEMOUNTABLE PARTITIONS
  • SM5
  • +10PT
  • Hose Reel
  • SURAU
  • LIBRARY
  • PANTRY
  • NURSING ROOM

ENCLOSED SPACE WITH EXHAUST FAN UNIVERSAL ACCESS DESIGN

Fire Door

Escape Route

SUSTAINABLE CONSTRUCTION REDUCE ENERGY USE BY HARNESSING DAYLIGHT.

  • SM11
  • +1PT
  • Exit Staircase
  • FIRST FLOOR PLAN

FIRE ALARM SYSTEM AND EXTINGUISHMENT SYSTEM ALL BUILDINGS MUST HAVE A FIRE ALARM OR EXTINGUISHING SYSTEM (REFER TO THE TENTH SCHEDULE).

EMERGENCY EXIT SIGNS

UBBL 225(1)

EXIT SIGNS MUST BE CLEARLY VISIBLE, UNOBSTRUCTED, AND ILLUMINATED DURING OCCUPANCY. "KELUAR" SIGNS WITH ARROWS ARE NEEDED IF EXIT DIRECTION ISN'T CLEAR. MUST COMPLY WITH MS 2687 AND MS 619.

  • UBBL 172
  • CALCULATE OF EXIT WIDTH
  • HOSE REEL SYSTEMS
  • GROUND FLOOR
  • FIRST FLOOR
  • FLOOR LEVEL

UBBL 226(A)

A HOSE REEL SYSTEM SHALL BE PROVIDED IN ACCORDANCE WITH THE TENTH SCHEDULE AND MS 1489.

FIRE ALARM SYSTEMS

UBBL

A FIRE ALARM SYSTEM SHALL BE PROVIDED IN ACCORDANCE WITH THE TENTH SCHEDULE AND MS 1745.

  • PURPOSE GROUP
  • BY-LAW 134 FIFTH SCHEDULE
  • V SHOP
  • V SHOP

PROVISION OF FIRE FIGHTING SHAFTS

A FIREFIGHTING LOBBY IS NEEDED IF THE TOP FLOOR EXCEEDS 18 M OR BASEMENT EXCEEDS 9 M FROM FIRE APPLIANCE ACCESS. IT MUST CONNECT TO THE STAIRCASE, FIRE LIFT, AND RISER WITHIN 45 M, UNLESS THE STAIRCASE IS PRESSURISED. FIRE LIFTS MUST OPEN TO THE LOBBY OR VIA A PROTECTED CORRIDOR, WITH MAXIMUM 60 M TRAVEL DISTANCE (5% IN OPEN PLANS). LIFTS TO UPPER FLOORS SHOULDN'T SERVE BASEMENTS UNLESS FOR LOW FIRE LOAD OR CAR PARK, WITH PROTECTED LOBBIES.

EXIT DOORS

UBBL

EXIT DOORS MUST BE EASILY OPENED FROM INSIDE WITHOUT A KEY.

  • UBBL 197(A)
  • FLOOR AREA(SQM)
  • 640.54 SQM
  • 640.54 SQM

DOORS MUST AUTO-CLOSE AND RELEASE DURING POWER FAILURE OR FIRE ALARM.

  • OCCUPANT LOAD SEVENTH SCHEDULE
  • 6 GROSS
  • 1.5 NET
  • SPRINKLER SYSTEMS

UBBL

A SPRINKLER SYSTEM SHALL BE PROVIDED IN ACCORDANCE WITH THE TENTH SCHEDULE AND MS 1910.

PORTABLE FIRE EXTINGUISHERS

A PORTABLE FIRE EXTINGUISHER SHALL BE PROVIDED IN ALL BUILDINGS IN ACCORDANCE WITH MS 1539.

UBBL

OCCUPANT(PAX)

MOULD PREVENTION

DESIGN SYSTEMS TO PREVENT MOLD GROWTH MAINTAIN INDOOR HUMIDITY BELOW 70% RH. SELECT MATERIALS THAT PREVENT MOLD GROWTH AND CONTROL EXCESSIVE MOISTURE.

  • AND INDOOR AIR POLLUTANTS
  • CAPACITY EXIT
  • BY-LAW 176 SEVENTH SCHEDULE
  • EQ5
  • +2PT
  • TO DETERMINE THE COMFORT AND WELL-BEING.
  • EQ2
  • USE PRODUCTS WITHOUT ADDED UREA FORMALDEHYDE.

USE LOW VOC PAINTS, FLOORING AND ADHESIVES THROUGHOUT THE BUILDING.

  • +3PT
  • CAPACITY EXIT
  • 1 UNIT=550M BY-LAW 181 & 177
  • CO2 MONITORING & CONTROL
  • EQ4
  • (7.11 X 550)+300=4216MM
  • (5.69 X 550)+300=3159.5MM
  • +2PT

PROVIDE RESPONSE MONITORING OF CO2 LEVELS TO MAINTAIN CO2 LEVEL ≤ 1,000 PPM.