Back
Flip
Vertical
Horizontal
All Pages
1 / 30
Mailing List
Share
Fullscreen
ricson liow chun guan avatar

PP_EPORTFOLIO_0351029

By ricson liow chun guan

Go to stand
Share link
https://covver.com/magazine/ric13320/pp-eportfolio-0351029-2
Published
Jul 23, 2026
Pages
30

More in this magazine

  • ARC 62604BACHELOR OF ARTS (HONOURS) IN INTERIOR ARCHITECTURE PROFESSIONAL
  • 01 ASSIGNMENT 1GROUP PRESENTATION SPREAD (SPACE LIGHT & VENTILATION) WEEKLY PROGRESS SUBMISSIONS
  • Page 301 ASSIGNMENT 1
  • SPACE, LIGHT & VENTILATIONBY-LAW 35 ACCESS FROM A STREET
  • BY-LAW 37PROJECTIONS OVER THE STREET AND OVER THE BUILDING LINE BY-LAW 39
  • BY-LAW 40AIR-WELLS Skylight to maximize use of natural light.
  • Page 73 This provision apply to building with mechanically ventilated or air conditioned. The provisions of these bylaws regarding natural ventilation and natural lighting shall not apply to lavatories, water closets, bathrooms, or corridors where permanent mechanical ventilation is provided for and maintained in accordance with the requirements of the Third Schedule to these bylaws.
  • DRAFT SUBMISSIONSPACE,LIGHT & VENTILATION
  • Page 9UBBL SPACE,LIGHT & VENTILATION
  • Page 1002 ASSIGNMENT 2
  • QUESTION 1QUESTION 1 INTERIOR DESIGN LICENSURE EXAMINATION
  • QUESTION 1QUESTION 1B QUESTION 1A
  • QUESTION 2QUESTION 2 (30 marks)
  • QUESTION 2QUESTION 28 QUESTION 2A
  • Page 1503 ASSIGNMENT 3
  • SIZE: 893SQFTRENTAL: RM3600/MONTH RENT RATE: RM 4.14 PSF (FLOOR)
  • SERVICE FRAMEWORKMARKETINGS STRATEGIES SPATIAL PLANNING & DESIGN CONSULTANCY (01
  • FUTURE PRACTICEDIGITAL & SMART DESIGN PRACTICE D
  • DRAFT SUBMISSIONSTAMPING MONTHLY EXPENDITURE
  • Page 2104 FINAL ASSIGNMENT
  • LIOW CHUN GUAN 0351029PROFESSIONAL PPRACTICE ARC 62604 FINAL PROJECT
  • SEVENTH SCHEDULE: MAXIMUM TRAVEL DISTANCEMEASUREMENT OF TRAVI UBBL 140(3G) THE MAXIMUM TRAVEL DISTANCES SHALL BE AS SPECIFIED IN THE SEV EXITS TO BE ACCESSIBLE AT ALL TIMES
  • EL DISTANCE TO EXITSTO EXITS AND DEAD END LIMITS ENTH SCHEDULE OF THESE BY LAWS EXIT ROUTE
  • DISABLED ACCESSIBILITYEXTINGUISHING SYSTEM FIRE ALARM
  • DRAFT SUBMISSIONDESIGN PROJECT ECHOES SACRED ECHOES IS AN IMMERSIVE CULTURAL EXPERIENCE CENTRE INSPIRED BY THE NINE EMPEROR GODS FESTIVAL AND THE PHILOSOPHY OF YIN AND YANG LOCATED IN ROYAL KLANG TOWN, THE PROJECT AIMS TO PRESERVE AND REINTERPRET LOCAL CULTURAL HERITAGE THROUGH INTERACTIVE EXHIBITIONS RITUAL-INSPIRED SPATIAL EXPERIENCES, TRADITIONAL CRAFT WORKSHOPS LEARNING SPACES AND COMMUNITY GATHERING AREAS. THE DESIGN CREATES A CONTEMPORARY PLATFORM FOR CULTURAL EDUCATION ENGAGEMENT AND CONTION WHILE STRENGTHENING APPRECIATION BETWE TRADITION
  • Page 2705 CONCLUSION
  • REFLECTIVE ESSAYTHIS PROFESSIONAL PRACTICE MODULE HAS PROVIDED ME WITH A DEEPER UNDERSTANDING OF THE RESPONSIBILITIES AND REALITIES OF BECOMING A PROFESSIONAL INTERIOR DESIGNER. THROUGHOUT THE SEMESTER, I GAINED VALUABLE KNOWLEDGE BEYOND THE DESIGN PROCESS, INCLUDING BUILDING BY-LAWS, PROFESSIONAL ETHICS, LICENSING REQUIREMENTS, CONSULTANCY PRACTICE, BUSINESS MANAGEMENT, AND STATUTORY SUBMISSION PROCEDURES. EACH ASSIGNMENT CHALLENGED ME TO THINK CRITICALLY, CONDUCT THOROUGH RESEARCH, AND APPLY INDUSTRY STANDARDS IN A PRACTICAL CONTEXT. WORKING ON THESE PROJECTS HAS STRENGTHENED MY ABILITY TO CONNECT CREATIVE DESIGN WITH PROFESSIONAL PRACTICE. I REALISED THAT SUCCESSFUL INTERIOR DESIGN IS NOT ONLY ABOUT CREATING
  • Page 2906 E-PORTFOLIO LINK
Text of this page

LIOW CHUN GUAN 0351029

  • PROFESSIONAL PPRACTICE ARC 62604
  • FINAL PROJECT
  • TAYLOR'S

BACHELORS OF ART (HONOURS) IN INTERIOR ARCHITECTURE

UNIVERSITY

ARTICLE 3: CONTRACT OF DOCUMENTATION

CONTRACT DRAWINGS

| LETTER OF AWARD MIID FORMALLY ACKNOWLEDGES THE APPOINTED CONTRACTOR, CONFIRMING KEY CONTRACT DETAILS AND OUTLINING STEPS FOR AGREEMENT SIGNING NOTICE TO PROCEED.

ARTICLES OF AGREEMENT

A LEGALLY BINDING CONTRACT SIGNED BY CLIENT AND CONTRACTOR, DETAILING SCOPE, RESPONSIBILITIES, CONTRACT SUM, PAYMENT TERMS, TIMELINES, PENALTIES, INSURANCE, AND ¡ CONDITIONS OF CONTRACT.

FORM OF TENDER

SACRED ECHOES

PROJECT INTRODUCTION

CONSTRUCTION DRAWINGS SIGNED BY REGISTERED INTERIOR DESIGNERS AND CONSULTANTS, FORMING PART OF THE CONTRACT. THEY DETAIL DIMENSIONS, MATERIALS, FINISHES, M&E LAYOUTS, I JOINERY, AND POST-TENDER REVISIONS.

THE CONTRACTOR'S FORMAL OFFER, DETAILING QUOTED PRICE, RATE PROJECT

BREAKDOWN, TIMELINE, TENDER AND COMPLIANCE CONDITIONS

SACRED ECHOES IS AN IMMERSIVE CULTURAL EXPERIENCE REINTERPRETS THE SPIRITUAL TRADITIONS OF THE NINE EMPEROR GODS FESTIVAL INTO A CONTEMPORARY ARCHITECTURAL JOURNEY. RATHER THAN PRESERVING THE FESTIVAL AS A STATIC EXHIBITION, THE PROJECT TRANSFORMS ITS RITUALS, SYMBOLISM AND COLLECTIVE MEMORIES INTO A SEQUENCE OF MEANINGFUL SPATIAL EXPERIENCES.

THAT AND VALIDITY, WITH MIID-PAM AND POLICIES.

INSPIRED BY THE CEREMONIAL PROGRESSION OF PURIFICATION, OFFERING, LEARNING AND REFLECTION, VISITORS ARE GUIDED THROUGH INTERCONNECTED SPACES THAT EVOKE THE RHYTHM OF THE FESTIVAL. LIGHT, WATER, INCENSE, SOUND AND MATERIALITY BECOME INTANGIBLE DESIGN ELEMENTS THAT SHAPE AN ATMOSPHERE OF REVERENCE WHILE ENCOURAGING CULTURAL UNDERSTANDING. THROUGH THIS SPATIAL NARRATIVE, SACRED ECHOES BRIDGES HERITAGE AND MODERN LIVING, ALLOWING ANCIENT TRADITIONS TO CONTINUE RESONATING WITHIN CONTEMPORARY SOCIETY.

CONTRACT BILLS

MIID FORMALLY ACKNOWLEDGES THE APPOINTED CONTRACTOR, CONFIRMING KEY CONTRACT DETAILS AND OUTLINING STEPS FOR AGREEMENT SIGNING AND NOTICE TO PROCEED.

MAJLIS BANDARAYA DIRAJA KLANG, THE VISITOR JOURNEY UNFOLDS THROUGH A SEQUENCE OF INTERCONNECTED SPACES, BEGINNING WITH ARRIVAL AND PURIFICATION BEFORE PROGRESSING TOWARDS OFFERING, LEARNING, CRAFTSMANSHIP AND REFLECTION. EACH SPACE REPRESENTS A STAGE OF THE CEREMONIAL EXPERIENCE, ENCOURAGING VISITORS TO ENGAGE WITH THE TRADITIONS OF THE NINE EMPEROR GODS FESTIVAL THROUGH PARTICIPATION RATHER THAN OBSERVATION. BY MERGING RITUAL, EDUCATION AND COMMUNITY WITHIN A CONTEMPORARY SETTING, SACRED ECHOES CREATES A LIVING CULTURAL DESTINATION WHERE SACRED TRADITIONS CONTINUE TO RESONATE ACROSS GENERATIONS.

  • HYZW x
  • LOCAL AUTHORITY: MAJILIS BANDARAYA DIRAJA KLANG
  • JALAN RAYA TIMUR
  • PAM

SUBMISSION OF PLANS FOR APPROVAL ALL BUILDING PLANS ARE SUBMITTED TO THE LOCAL AUTHORITY FOR APPROVAL WHICH IS DEPOSITED AT THE OFFICE OF LOCAL THE AUTHORITY TOGETHER WITH SITE CONTEXT MAP

UBBL 134

FORM A CERTIFICATION OF DEMOLITION BUILDINGS/ STRUCTURAL PLANS

  • FORM B
  • FORM F
  • NOTICE OF COMMENCEMENT/RESUMPTI
  • ON OF BUILDING OPERATIONS
  • CERTIFICATE OF COMPLETION AND COMPLIANCE
  • GREEN BUILDING INDEX
  • POINTS
  • THE FILES.
  • index
  • FIFTH SCHEDULE:

DESIGNATION OF PURPOSE GROUPS

DESIGNATION OF PURPOSE GROUPS EACH BUILDING OR COMPARTMENT IS CLASSIFIED BY ITS USE BASED ON THE FIFTH SCHEDULE. IF A BUILDING HAS COMPARTMENTS FOR DIFFERENT USES, EACH IS ASSESSED SEPARATELY. HOWEVER, IF A SPACE SERVES MULTIPLE PURPOSES, ONLY THE MAIN USE DETERMINES ITS PURPOSE GROUP.

ENGAGEMENT OF QUALIFIED PROFESSIONALS APPOINT A QUALIFIED PROFESSIONAL TEAM OF DESIGN CONSULTANTS.

  • EXTERNAL VIEW
  • UBBL 134
  • EE1

EQ10 +1PT

75% OF ALL WORKING SPACES HAS A DIRECT LINE OF SIGHT THROUGH VISION GLAZING AT A HEIGHT OF 1.2M FROM FLOOR LEVEL.

  • +2PT
  • GROUP VII – PLACE OF ASSEMBLY
  • LIGHTING & PLUG LOAD
  • SUSTAINABLE SPACE DESIGN

⚫ PROVISION OF AN OPEN PLANNING LAYOUT ≥ 50% OR ANY OTHER EQUIVALENT SPACE

PROVISION OF WIRELESS CONNECTIVITY

PROVISION OF A DEDICATED RECREATION OR BREAK-OUT OR ANY OTHER EQUIVALENT SPACE TO CATER TO OCCUPANT NEEDS PROVISION OF UNIVERSAL ACCESS DESIGN

PLACE, WHETHER PUBLIC OR PRIVATE, USED FOR THE ATTENDANCE OF PERSONS FOR OR IN CONNECTION WITH THEIR SOCIAL, RECREATIONAL, EDUCATIONAL, BUSINESS OR OTHER ACTIVITIES, AND NOT COMPRISED WITHIN GROUP I TO VI, INCLUDING A CONVENTION CENTRE, MUSEUM, ART GALLERY, CINEMA, THEATRE, AUDITORIUM, PLACE OF WORSHIP, OR TRANSPORTATION PASSENGER TERMINAL.

TO OPTIMISE ENERGY EFFICIENCY BY ENABLING LIGHTING TO BE CONTROLLED IN RESPONSE TO OCCUPANCY PATTERNS AND FUNCTIONAL ZONING WITHIN THE INTERIOR SPACE.

EE2 +12PT

PROVISIONS OF COMPARTMENT WALLS AND COMPARTMENT FLOORS MULTI-STOREY BUILDINGS LISTED IN THE FIFTH SCHEDULE MUST BE COMPARTMENTALIZED IF ANY FLOOR AREA OR CUBIC CAPACITY EXCEEDS THE PERMITTED LIMITS. WITH A COMPLIANT AUTOMATIC SPRINKLER SYSTEM (MS 1910), THESE LIMITS MAY BE DOUBLED, EXCEPT FOR PATIENT ACCOMMODATION WARDS (BY-LAW 224A).

  • SM5
  • +4PT
  • UBBL 136

DAYLIGHT

50% OF THE NLA HAS A DAYLIGHT FACTOR IN THE RANGE OF 1.0 3.5% AS MEASURED AT 800MM FROM FLOOR LEVEL.

E06

GROUP V - SHOP

+12PT

SHOP, OR SHOP PREMISES, MEANING THEREBY PREMISES NOT BEING A SHOP BUT USED FOR THE CARRYING ON THERE OF RETAIL TRADE OR BUSINESS (INCLUDING THE SALE TO MEMBERS OF THE PUBLIC OF FOOD OR DRINK FOR IMMEDIATE CONSUMPTION, RETAIL SALES BY AUCTION, THE BUSINESS OF LENDING BOOKS OR PERIODICALS FOR THE PURPOSE OF GAIN, AND THE BUSINESS OF A BARBER OR HAIRDRESSER) AND PREMISES TO WHICH MEMBERS OF THE PUBLIC ARE INVITED TO RESORT FOR THE PURPOSE OF DELIVERING THEIR GOODS FOR REPAIR OR OTHER TREATMENT OR OF THEMSELVES CARRYING OUT REPAIRS TO OR OTHER TREATMENT OF GOODS.

NO OTHER WALLS AND FLOORS AS COMPARTMENT WALLS AND FLOORS

UBBL 138

• NO BASEMENT STOREY EXCEEDING 1000 SQUARE METRES.

NO WALL/FLOOR SEPARATING PART OF BUILDING FALLING IN DIFFERENT PURPOSE GROUPS.

  • PERFORMANCE DECK
  • LANTERN BAZAAR
  • RITUAL TEA BAR
  • DIMENSIONS OF BUILDINGS AND COMPARTMENTS
  • LIMIT OF A DIMENSION

HEIGNT OF A BUILDINGS IN METER (M)

PURPOSE GROUP

CUBRIC CAPACITY OF BUILDING OR COMPARTMENT IN FLOOR OF A STOREY IN BUILDING OR COMPARTMENT IN SQM

SQM

PART: BUILDINGS OTHER THAN SINGLE STOREY BUILDINGS

  • V SHOP
  • ANY HEIGHT
  • CURATED RETAIL GALLERY
  • PURIFICATION CHAMBER

CURATED RETAIL GALLERY

NOTE: PURPOSE GROUP I, IV, AND VII ARE EXCLUDED AS THERE ARE NO LIMITS APPLICABLE UNDER BY LAW 138.